Marine Electrical Power Systems:
Shipboard Electrical Power System Integration 1:
Preliminary and Contract Design

Last Update: November 2, 2024

Essential Questions

Essential Question Level of Thinking
What Is the end goal of preliminary and contract design?
Understand
What power and propulsion design activities are conducted during preliminary and contract design?
Understand
What are the power and propulsion design artifacts produced during preliminary and contract design?
Understand
What design tools are typically used for power and propulsion during preliminary and contract design?
Understand

Text Material

Presentation Material

Video Material

References

S9800-AC-MAN-010 NAVSEA Ship Design Manager (SDM) and Systems Integration Manager (SIM) Manual

IEEE Std 45.3 IEEE Recommended Practice for Electrical Installations on Shipboard--Systems Engineering

Doerry, Norbert, Andrew Johnson, Edward Ammeen, and Katherine Beaumont, "Design Activity Modeling, " SNAME Maritime Convention 2022, Houston TX, Sept 27-29, 2022.

Doerry, Norbert and John V. Amy Jr., "Integrating Power Electronic Equipment into Shipboard Power Systems", SNAME Maritime Convention 2024, Norfolk VA, October 15-16, 2024.


(C) Copyright 2024 Norbert Doerry

This work by Norbert Doerry is licensed under CC BY 4.0

Back to Shipboard Power System Fundamentals
Back to Marine Electrical Power Systems